Sewer Line Rehabilitation Program

Click here to go directly to weekly sewer rehabilitation work schedule.

Clarksville Gas and Water’s ongoing sewer rehabilitation program is underway in North Clarksville and surrounding service area and your help and cooperation is needed.

Rehab work will be done in and around manholes, sewer main lines and sewer lateral connections. While work is performed, customer sewer connections to the main line will be temporarily sealed off to help the work move forward. To avoid sewer backup during the process, it’s important that customers limit water and toilet use or any activity that would send water into household drains and sewer lines.

To help you plan for the date you will be affected by the work, an advance letter of notification of the work schedule will be mailed directly to residents from the contractor. A weekly work schedule will also be advertised in local media outlets and on this web page. Please keep in mind that some work may not be completed within the scheduled week and will be rescheduled to the following week.

The contractor’s onsite personnel will also make door-to-door visits, 1-2 days in advance, to inform residents or to leave an informative door hanger of the work to be performed.

More information may also be obtained by contacting Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water, Engineering Department, (931) 645-7418.

Customers are our number one priority and your understanding, cooperation and patience to help provide a well-maintained and efficient wastewater collection system is very much appreciated! 

CGW Sewer Rehab (BLD CIPP Customer Door Hanger)

CGW Sewer Rehab (BLD CIPP Customer Door Hanger) resized

CGW Sewer Rehab (Insituform Customer Notification Letter and Door Hanger)

Click on image to view larger.

CGW Sewer Rehab (Insituform Customer Door Hanger)

_________________________________________________________________________________

Sewer Line Rehabilitation Weekly Work Schedule


23 MAY 2018 Sewer Main Line Rehabilitation Work Schedule for May 23-24, 2018

Clarksville Gas and Water sewer main line rehabilitation contract work is scheduled for Wednesday and Thursday, May 23-24, on Commerce Street, weather permitting.

Contract workers will have a section of Commerce Street closed from Hiter Street to South Second Street at 9:00 a.m. until 6:00 p.m. Thursday evening, when the work is anticipated to finished, as follows.

  • Commerce Street closed between South Second Street and South Third Street
  • Left southbound lane of South Second Street closed between Franklin Street and Commerce Street

South Second Street and South Third Street will be passable; however, motorists may wish to choose an alternate route to avoid traffic congestion in the downtown area.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

UPDATE: Sewer lateral lining contact crews will also be working on Sherwood Drive this week, May 14-18.


11 MAY 2018 Sewer Lateral Line Rehabilitation Work Schedule for May 14-18, 2018


Clarksville Gas and Water sewer lateral line rehabilitation work will done on the following roads the week of May 14-18. Unfinished work will be added to the following week’s work schedule.

• Hillsboro Road
• Rebecca Lane
• E Bel Air Boulevard
• King Cole Drive
• Park Lane
• Maple Street
• Storybook Drive
• Dalewood Drive
• Canterbury Road

There will be no sewer main line rehabilitation work scheduled next week; however, main line crews plan to resume work on May 21 and a new work schedule will be announced at that time.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # # 

10 MAY 2018 Sewer Lateral Line Rehabilitation Work Schedule Update

Clarksville Gas and Water sewer lateral line rehabilitation contractors have added Park Lane in North Clarksville to this week’s work schedule, May 7-11.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # # 

09 MAY 2018 Sewer Main Line Rehabilitation Work Schedule Update for Madison Street


Clarksville Gas and Water sewer main line rehabilitation contract work on Madison Street is progressing ahead of schedule and adjustments have been made to the this week’s night time, 6 p.m.-6 a.m., work schedule.

The work at the intersection of Madison Street and Maplemere Drive originally scheduled for Thursday night has been rescheduled to tonight, Wednesday, May 9, and will close the center lane of Madison Street at the intersection of Maplemere.

Additional sewer rehab work added to Thursday night’s schedule will be done near the intersection of Madison Street and Memorial Drive and at the intersection of Madison Street and South Twelfth Street.

The outer westbound lane of Madison Street between 1803 and 1811 Madison and the center lane of Madison Street between 1128-1202 Madison will be closed during the work.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # # 

05 MAY 2018 Sewer Lateral and Main Line Rehabilitation Work Schedule for May 7-11, 2018

Clarksville Gas and Water sewer lateral and main line rehabilitation work will done on the following roads the week of May 7-11. Unfinished work will be added to the following week’s schedule.

Sewer Lateral Line
· Kirby Drive
· Strassbourg Road
· Sherwood Drive
· Allenwood Drive
· Collinwood Drive

Sewer Main Line
· N. Liberty Church Road
· Jordan Road
· Azalea Court
· 1604 Madison Street
· 1218 Madison Street
· Amber Way
· Maplemere Drive

The 1604 Madison Street rehab work will take place Tuesday during the early morning hours to avoid area business operation hours with no lane or road closures.

The 1218 Madison Street work will done Thursday night at the intersections of Madison Street and South Twelfth Street and Madison Street and Maplemere Drive. The center lane of Madison Street at the intersection of South Twelfth Street and Madison Street and at the intersection of Maplemere Drive and Madison Street will be closed and may move along Madison Street as the work progresses.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #


27 APRIL 2018 Sewer Lateral Line Rehabilitation Work Schedule for April 30-May 4, 2018

Clarksville Gas and Water sewer lateral line rehabilitation work will done on the following roads the week of April 30-May 4. Unfinished work will be added to the following week’s schedule.

• Charlemagne Boulevard
• Canterbury Road
• Sherwood Drive
• Allenwood Drive
• Strasbourg Road
• Collinwood Drive

While the work is performed, customer sewer connections to the main line will be temporarily sealed off to help the work move forward. To avoid sewer backup during the process, it’s important that customers limit water and toilet use or any activity that would send water into household drains and sewer lines.

Contractors notify residents in the affected work area in advance either by letter or door-to-door visits of the type of work to be performed and the work schedule. If no one is home, an informative door hanger will be left.

Sewer lateral line rehabilitation is part of the department’s ongoing sewer rehabilitation program designed to provide citizens with a well-maintained and efficient sewer collection system.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #


27 MAY 2018 Sewer Main Line Rehabilitation Work to Start Up


Clarksville Gas and Water contractors are scheduled to start this year’s sewer main line rehabilitation work on Monday, April 30, as part of Clarksville’s ongoing sewer rehabilitation program.

Work will take place in different locations throughout Clarksville; however, the following streets listed below will start off the schedule for April 30 to May 4.

• Evans Road
• Britton Springs Road
• Paula Drive
• Glennon Drive
• Appleton Drive
• North Liberty Church Road
• Memorial Drive and Madison Street intersection (6 pm-6 am)

The Madison Street and Memorial Drive intersection work is planned for Thursday, May 3, between 6:00 p.m. and 6:00 a.m. The outermost westbound lane of Madison Street will be closed from 1803 Madison Street to the intersection and the outermost northbound lane of Memorial Drive will be closed from the intersection to 1718 Memorial Drive during the work. Northbound traffic on Memorial Drive will be diverted to the center lane to bypass the work zone.

An advance letter of notification of scheduled work is mailed directly from the contractor to residents to help them plan for the date they will be affected. Onsite contract personnel also make door-to-door visits to inform residents or to leave an informative door hanger of the work to be performed and weekly work schedules will be announced and published on the Gas and Water website, www.clarksvillegw.com.

Sewer main line rehabilitation work is done in and around manholes and sewer main lines. The customer sewer service connection to the main line is temporarily sealed off to help the work move forward. It’s important that affected residents limit water and toilet use or any activity that would send waste water into household drains and into sewer lines to avoid a sewer backup during the process.

We appreciate the customers’ cooperation and understanding to help us provide a well-maintained and efficient sewer system. More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

23 APRIL 2018 Sewer Lateral Line Rehabilitation Work Schedule for April 23-27, 2018

Clarksville Gas and Water sewer lateral line rehabilitation work will continue on Charlemagne Boulevard and Canterbury Road the week of April 23-27.

While the work is performed, customer sewer connections to the main line will be temporarily sealed off to help the work move forward. To avoid sewer backup during the process, it’s important that customers limit water and toilet use or any activity that would send water into household drains and sewer lines.

Contractors notify residents in the affected work area in advance either by letter or door-to-door visits of the type of work to be performed and the work schedule. If no one is home, an informative door hanger will be left.

Sewer lateral line rehabilitation is part of the department’s ongoing sewer rehabilitation program designed to provide citizens with a well-maintained and efficient sewer collection system.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #


16 APRIL 2018 Sewer Lateral Line Rehabilitation Work Schedule for April 16-20, 2018

Clarksville Gas and Water sewer lateral line rehabilitation work will take place on Charlemagne Boulevard in North Clarksville and on Canterbury Road in the Beachaven subdivision the week of April 16-20.

While the work is performed, customer sewer connections to the main line will be temporarily sealed off to help the work move forward. To avoid sewer backup during the process, it’s important that customers limit water and toilet use or any activity that would send water into household drains and sewer lines.

Contractors notify residents in the affected work area in advance either by letter or door-to-door visits of the type of work to be performed and the work schedule. If no one is home, an informative door hanger will be left.

Sewer lateral line rehabilitation is part of the department’s ongoing sewer rehabilitation program designed to provide citizens with a well-maintained and efficient sewer collection system.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

06 APRIL 2018 Sewer Lateral Line Rehabilitation Work Schedule for April 9-13, 2018

Clarksville Gas and Water sewer lateral line rehabilitation work will take place on Storybook Drive and Dalewood Drive the week of April 9-13.

While the work is performed, customer sewer connections to the main line will be temporarily sealed off to help the work move forward. To avoid sewer backup during the process, it’s important that customers limit water and toilet use or any activity that would send water into household drains and sewer lines.

Contractors notify residents in the affected work area in advance either by letter or door-to-door visits of the type of work to be performed and the work schedule. If no one is home, an informative door hanger will be left.

Sewer lateral line rehabilitation is part of the department’s ongoing sewer rehabilitation program designed to provide citizens with a well-maintained and efficient sewer collection system.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # # 

02 APRIL 2018 Sewer Lateral Line Rehabilitation Work Schedule for April 2-6, 2018

Clarksville Gas and Water sewer lateral line rehabilitation work will take place on Appleton Drive, Storybook Drive and Park Lane today through Friday, April 2-6.

While the work is performed, customer sewer connections to the main line will be temporarily sealed off to help the work move forward. To avoid sewer backup during the process, it’s important that customers limit water and toilet use or any activity that would send water into household drains and sewer lines.

Contractors notify residents in the affected work area in advance either by letter or door-to-door visits of the type of work to be performed and the work schedule. If no one is home, an informative door hanger will be left.

Sewer lateral line rehabilitation is part of the department’s ongoing sewer rehabilitation program designed to provide citizens with a well-maintained and efficient sewer collection system.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

16 MARCH 2016 Sewer Line Rehabilitation Work Starts Up Monday


Clarksville Gas and Water sewer lateral line rehabilitation work is scheduled to begin for the year on Monday, March 19, in North Clarksville and is anticipated to be finished by late May.

The week of March 19-23, sewer rehab contractors will work on Storybook Drive and the following week, March 26-30, on Appleton Drive.

Weekly work schedules and locations will be announced to the public and posted on the Gas and Water website, www.clarksvillegw.com.

Contractors will also notify residents in the affected work area in advance either by letter or door-to-door visits of the type of work to be performed and the work schedule. If no one is home, an informative door hanger will be left.

Sewer lateral line rehabilitation is part of the department’s ongoing sewer rehabilitation program designed to provide citizens with a well-maintained and efficient sewer collection system.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # # 

20 OCTOBER 2017 Sewer Lateral Line Rehabilitation Work Schedule for October 23-27, 2017

Clarksville Gas and Water sewer lateral line rehabilitation contract work is scheduled on King Cole Drive, Storybook Drive and Bo Peep Lane for the week of Oct. 23-27.

While the work is performed, customer sewer connections to the main line will be temporarily sealed off to help the work move forward. To avoid sewer backup during the process, it’s important that customers limit water and toilet use or any activity that would send water into household drains and sewer lines.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

13 OCTOBER 2017 Sewer Lateral Line Rehabilitation Work Schedule for October 16-20, 2017

Clarksville Gas and Water sewer lateral line rehabilitation contractors will continue work on King Cole Drive on Monday through Friday, Oct. 16-20.

While the work is performed, customer sewer connections to the main line will be temporarily sealed off to help the work move forward. To avoid sewer backup during the process, it’s important that customers limit water and toilet use or any activity that would send water into household drains and sewer lines.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #


09 OCTOBER 2017 Sewer Lateral Line Rehabilitation Work Schedule for October 9-13, 2017

Clarksville Gas and Water sewer lateral line rehabilitation contractors will be working on King Cole Drive starting today through Friday, October 13.

While the work is performed, customer sewer connections to the main line will be temporarily sealed off to help the work move forward. To avoid sewer backup during the process, it’s important that customers limit water and toilet use or any activity that would send water into household drains and sewer lines.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #


03 OCTOBER 2017 Sewer Lateral Line Rehabilitation Work Continues in Clarksville

Clarksville Gas and Water sub-contractors will continue sewer lateral line flushing and cleaning that began in early September through Friday, Oct. 6, on the following streets.

• Saratoga Drive
• Brandywine Drive
• King Cole Drive
• Allenwood Drive
• Kirby Drive
• Strasbourg Drive
• Collinwood Drive
• Sherwood Drive
• Canterbury Road
• Nice Drive
• Charlemagne Boulevard
• Verdun Drive
• Rue Le Mans Drive
• Melinda Drive

Sewer service will not be affected during the work, however; residents should be alert to workers and equipment in their neighborhoods.

The sewer lateral flushing will prepare lines for future sewer main line rehabilitation work this month.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

29 MAY 2017 Talley Drive Lane Closure Planned for Sewer Line Rehabilitation Work


Clarksville Gas and Water will close one lane of Talley Drive near the Crossland Avenue intersection on Tuesday, May 30, 2017, for most of the day for sewer main line rehabilitation work.

Both roads will be passable; however, motorists are advised to slow down and be alert to directional signs and flaggers when approaching the work zone.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

 

25 MAY 2017 Sewer Main Line Rehabilitation Contract Work Scheduled

Clarksville Gas and Water contractors are scheduled to start sewer main line rehabilitation work on Thursday, May 25, as part of Clarksville’s ongoing sewer rehabilitation program.
Work will begin on the following streets through Friday, May 26, and unfinished work will be rescheduled to the following work week.

- Madison Street
- S 7th Street

An advance letter of notification of scheduled work is mailed directly from the contractor to residents to help them plan for the date they will be affected. Onsite contract personnel also make door-to-door visits to inform residents or to leave an informative door hanger of the work to be performed.

Sewer rehabilitation work is done in and around manholes and sewer main lines. The customer sewer service connection to the main line is temporarily sealed off to help the work move forward. It’s important that affected residents limit water and toilet use or any activity that would send waste water into household drains and into sewer lines to avoid a sewer backup during the process.

We appreciate the customers’ cooperation and understanding to help us provide a well-maintained and efficient sewer system. More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

05 MAY 2017 Sewer Main Line Rehabilitation Contract Work Scheduled to Start Up
May 8-12, 2017

Clarksville Gas and Water contractors are scheduled to start up sewer main line rehabilitation work in North Clarksville on Monday, May 8, as part of Clarksville’s ongoing sewer rehabilitation program.

Work will begin on the following streets through Friday, May 12, and unfinished work will be rescheduled to the following work week.

- Beech Street
- Britton Springs Road
- Cunningham Lane
- Hadley Drive
- Kirby Drive
- Norris Drive
- Peggy Drive
- East Fork Drive
- West Fork Drive

An advance letter of notification of scheduled work is mailed directly from the contractor to residents to help them plan for the date they will be affected. Onsite contract personnel also make door-to-door visits to inform residents or to leave an informative door hanger of the work to be performed.

Sewer rehabilitation work is done in and around manholes and sewer main lines and the customer sewer service connection to the main line is temporarily sealed off to help the work move forward. It’s important that affected residents limit water and toilet use or any activity that would send waste water into household drains and into sewer lines to avoid a sewer backup during the process.

We appreciate the customers’ cooperation and understanding to help us provide a well-maintained and efficient sewer system. More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

13 MARCH 2017 Sewer Line Rehabilitation Work Schedule for March 13-20, 2017 

Clarksville Gas and Water sewer lateral line rehabilitation work will finish this week on Collinwood Drive and sewer main line rehabilitation will begin Wednesday on Beech Street, A Street, Short A Street and Peggy Drive through Monday.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

 06 MARCH 2017 Sewer Line Rehabilitation Work Schedule for March 6-10, 2017

Clarksville Gas and Water sewer lateral line rehabilitation work will take place on the following roads during the week of March 6-10.

Collinwood Drive
E Bel Air Boulevard
Downer Drive
Park Lane
Rebecca Lane
Hillsboro Road

Unfinished work will continue into the following work week.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

27 FEBRUARY 2017 Sewer Line Rehabilitation Work Schedule for February 27-March 3, 2017

Clarksville Gas and Water sewer lateral line rehabilitation contractors will work on Collinwood Drive, Rebecca Lane, Saratoga Drive and Park Lane during the week of February 27-March 3.

Unfinished work on assigned streets will continue into the following work week.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

UPDATE: Dale Terrace and Stone Mountain Road have been added to the February 20-24 sewer lateral line rehabilitation work schedule

17 FEBRUARY 2017 Sewer Line Rehabilitation Work Schedule for February 20-24, 2017

Clarksville Gas and Water sewer lateral line rehabilitation contract work will continue on Storybook Drive in the Story Book Acres subdivision during the week of February 20-24.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

13 FEBRUARY 2017 Sewer Line Rehabilitation Work Schedule for February 13-17, 2017


Clarksville Gas and Water sewer lateral line rehabilitation contract work will take place on King Cole and Storybook Drive in the Story Book Acres subdivision during the week of February 13-17.

Unfinished work on assigned streets will continue into the following work week.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

03 FEBRUARY 2017 Sewer Line Rehabilitation Work Schedule for February 6-10, 2017

Clarksville Gas and Water sewer lateral line rehabilitation contract work will take place on King Cole Drive, Chestnut Drive and Dale Terrace during the week of February 6-10.

Unfinished work on assigned streets will continue into the following work week.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

03 FEBRUARY 2017 Sewer Line Rehabilitation Work Schedule UPDATE

The sewer lateral line rehab crew have finished work this week on Lealand Drive, Saratoga Drive and Brandywine Drive and will be working on Gino Drive in the Virginia Terrace subdivision today.

# # # 

26 JANUARY 2017 Sewer Line Rehabilitation Work Scheduled to Begin

Week of January 30, 2017 to February 3, 2017

Clarksville Gas and Water sewer lateral line rehabilitation work is scheduled to begin for the year on Monday, January 30, 2017, in North Clarksville.

Sewer rehab contractors will be working on Lealand Drive, Saratoga Drive and Brandywine Drive through Friday, February 3rd.

Weekly work schedules and locations will be announced to the public and posted on the Gas and Water website, www.clarksvillegw.com.

Contractors will also notify residents in the affected work area in advance either by letter or door-to-door visits of the type of work to be performed and the work schedule. If no one is home, an informative door hanger will be left.

Sewer lateral line rehabilitation is part of the department’s ongoing sewer rehabilitation program designed to provide citizens with a well-maintained and efficient sewer collection system.

More details about sewer line rehabilitation can be viewed on the Gas and Water website, www.clarksvillegw.com, or please contact Y’hanna Perez-Ortiz, P.E., Civil Engineer, at the Clarksville Gas and Water Engineering Department, 931-645-7418.

# # #

 

 

 

 

____________________________________________________________________________

 

Weekly Sewer Rehab Work Schedule Archives


19 MAY 2016 Sewer Line Rehabilitation Work Schedule for May 23-27, 2016

13 MAY 2016 Sewer Line Rehabilitation Work Schedule for May 16-20, 2016

06 MAY 2016 Sewer Line Rehabilitation Work Schedule for May 9-13, 2016

25 APRIL 2016 Sewer Line Rehabilitation Work Schedule for April 25-29, 2016

18 APRIL 2016 Sewer Line Rehabilitation Work Schedule for April 18-22, 2016

08 APRIL 2016 Sewer Line Rehabilitation Work Schedule for April 11-15, 2016

14 MARCH 2016 Sewer Line Rehabilitation Work Schedule for March 14-18, 2016

04 MARCH 2016 Sewer Line Rehabilitation Work Schedule for March 7-11, 2016

29 FEBRUARY 2016 Sewer Line Rehabilitation Work Schedule for February 29-March 4, 2016

22 FEBRUARY 2016 Sewer Line Rehabilitation Work Begins Tomorrow

02 NOVEMBER 2015 Sewer Line Rehabilitation Work Schedule for November 2-6, 2015

26 OCTOBER 2015 Dale Terrace Added to Sewer Line Rehabilitation Work Schedule for October 26-30, 2015

23 OCTOBER 2017 Sewer Line Rehabilitation Work Schedule for October 26-30, 2015

16 OCTOBER 2015 Sewer Line Rehabilitation Work Schedule for October 19-23, 2015

09 OCTOBER 2015 Gas and Water Sewer Line Rehabilitation Work to Start Up

27 JUNE 2015 Sewer Rehab Line Work Schedule for June 29-July 3, 2015

22 JUNE 2015 Sewer Line Rehab Work Schedule for June 22-26, 2015

12 JUNE 2015 Sewer Rehab Work Schedule for June 15-19, 2015

08 JUNE 2015 Sewer Rehab Work Schedule for June 8-12, 2015

29 MAY 2015 Sewer Rehab Work Schedule for June 1-5, 2015 

24 MAY 2015 Sewer Rehab Work Schedule for May 25-29, 2015

14 MAY 2015 Sewer Rehab Work Schedule for May 18-22, 2015 

11 MAY 2015 Sewer Rehab Work Schedule for May 11-15, 2015

01 MAY 2015 Sewer Rehab Work Schedule for May 4-8, 2015

24 APRIL 2015 Sewer Rehab Work Schedule for April 27-May1, 2015

17 APRIL 2015 Sewer Rehab work Schedule for April 20-24, 2015

09 APRIL 2015 Sewer Line Rehabilitation Work Scheduled

26 MARCH 2015 Sewer Line Rehabilitation Work Start-Up Postponed

25 MARCH 2015 Sewer Line Rehabilitation Work to Start-Up 

6 JUNE 2014 Sewer Rehab Work Schedule for June 9-13, 2014

2 JUNE 2014 Sewer Rehab Work Schedule for June 2-6, 2014

20 MAY 2014 UPDATE Sewer Rehab Work Schedule for May 19-23, 2014

15 MAY 2014 Sewer Rehab Work Schedule for May 19-23, 2014

9 MAY 2014 Sewer Rehab Work Schedule for May 12-16, 2014

2 MAY 2014 Sewer Rehab Work Schedule for May 5-9, 2014

25 APRIL 2014 Sewer Rehab Work Schedule for April 28-May 2, 2014

17 APRIL 2014 Sewer Rehab Work Schedule for April 21-25, 2014

21 MARCH 2014 Sewer Rehab Work Schedule for March 24-28, 2014

21 FEBRUARY 2014 Sewer Rehab Schedule for February 24-28, 2014

14 FEBRUARY 2014 Clarksville's Sewer Rehab Work Back on Schedule 

13 DECEMBER 2013 Sewer Rehab Schedule for December 16-20, 2013

02 DECEMBER 2013 Sewer Rehab Work Scheduled in North Clarksville

18 OCTOBER 2013 Sewer Rehab Work Schedule for October 21-25

14 OCTOBER 2013 Sewer Rehab Schedule for October 14-18

04 OCTOBER 2013 Sewer Rehab Work Schedule for October 7-11

13 SEPTEMBER 2013 Sewer Rehab Work Schedule for September 16-20

6 SEPTEMBER 2013 Sewer Rehab Work Schedule for September 9-13

30 AUGUST 2013 Sewer Rehab Work Resumes

5 JULY 2013 Sewer Work Schedule July 8-12, 2013

28 June 2013 Sewer Rehab Work Scheduled for July 1-5, 2013

21 JUNE 2013 Sewer Rehab Work Scheduled for June 24-28, 2015 

14 JUNE 2013 Sewer Rehab Work Schedule for June 17-21

7 JUNE 2013 Sewer Rehab Work Underway in Clarksville

 

Last updated: 5/23/2018 8:04:40 AM